7 working days
Standard turnaround from sample receipt
NABL TC-5843
Accredited to ISO/IEC 17025:2017
Respirable dust samplers and fine particulate samplers
Primary technique on this service
14,000 sq. ft.
Integrated laboratory in Jaipur
This service combines on-site sampling with laboratory analysis across the four media a plant is judged on: ambient air, stack emissions, water and soil, plus noise. Our team draws the samples under the prescribed method so the chain of custody holds up in front of a regulator.
Half-yearly compliance reporting under consent to operate
Preparing an environmental statement, EIA or clearance application
Commissioning a new unit, stack or effluent treatment plant
A complaint, notice or show-cause from the pollution board
What we test on this service
Panels are built from the list below. Tell us the market and the specification and we select the parameters it calls for rather than selling you the whole sheet.
Ambient air: PM10, PM2.5, SO2, NOx, CO, ozone, benzene
Stack emissions: particulate matter, SO2, NOx, HCl, metals
Workplace air and fugitive emissions
Soil physico-chemical and heavy metal profile
Noise levels day and night
Surface and groundwater quality
Method
How the analysis runs
Instrumentation and controls
Every batch runs with the controls its method requires, on calibrated equipment, and a second analyst reviews the data before the report is released.
Standards and methods
Results are reported against the method below, or against your buyer's specification where you send one with the sample.
Ask for the full NABL scope document if you need to confirm accredited coverage before sending the sample.
Not sure which parameters your buyer wants?
Send us the specification. We will tell you what to test and what it costs, at no charge.
The approvals this work is issued under
Our environmental scope is approved by the Central Pollution Control Board and accredited under NABL TC-5843, so reports are accepted for consent renewal and half-yearly compliance filing.
Before you send it
Monitoring is carried out on site by our team. Share the site layout, the number of locations and the consent conditions and we plan the campaign around them.
Field campaign as scheduled, then 7 working days for the analytical report. 24-hour ambient air cycles run as per CPCB frequency requirements.
Manufacturing plants under consent to operate
EIA and environmental consultants
Infrastructure and mining projects
State pollution control boards and PSUs
Send a sample
Fill in the Test Request Form, pack the sample as described above and courier it to the Jaipur laboratory. Call us first if the sample is perishable.
Get the TRFRelated queries
Questions we get asked
Can you handle a full half-yearly compliance package?
Yes. Ambient air, stack, effluent, ground water, soil and noise in one campaign with a single consolidated report.
Do you travel outside Rajasthan?
Yes. Our sampling teams work across India, supported by the ISSPL office network.
How much notice do you need for a field campaign?
Seven to ten working days for a multi-location campaign, sooner for a single stack or effluent visit.
What do you need from us on site?
Access, a safe ported stack platform with power, the consent copy and someone who knows the process running that day.
Can the report be addressed to the pollution board?
Yes. Tell us the board and the consent number and we issue it in the format they accept.
Request a quote
Tell us what you need tested
Send the product, the market it ships to and the standard you are being held to. Our technical team replies with the parameter list, the sample quantity we need and a firm turnaround. Quotes usually go out the same working day.
+91-9950229764 / +91-9634063932
Sample receipt: Monday to Saturday, 9:30 am to 6:00 pm